Bommarito Construction

Davidson Surface Air

UNIQUE FEATURES

  • Acted & Performed as a General Contractor (GC) for all site work.
  • Installation of 48” HDPE at an approximate depth of 16’ in middle of the Vandeventer Ave & Papin Street intersection while maintaining 4 lanes of vehicle traffic; bored 60” steel casing into intersection to tie into existing sewer system.